Industry





> UNB-450x700 pumping unit (cementing unit)

UNB-450x700 pumping unit (cementing unit)

Description     Order of production

Main technical characterestics and list of basic equipment

Table 1

Useful capacity, kWatts (hp)

452 (615)

Mode of working

See table 2

Assembly base

   - chassis type

KrAZ-63221-0000044

   - engine power, kWatts (hp)

240 (330)

   - load capacity, kg

22725

Power unit

   - diesel engine

V2-800TK-S4

   - aggregate capacity, kWatts (hp), not more than

588 (800)

   - rotation frequency of crankshaft, rev/min, not more than:

 

      a) under the aggregate capacity

2000

      b) maximum

2300

   - starting system

electric starter ST 722

   - accumulator, 4 items

6ST-190

Gear box

   - type

3KPm

   - gear ratio:

 

      a) at I gear

4,67

      b) at II gear

3,43

      c) at III gear

2,43

      d) at IV gear

1,93

Pump

   - type

3PN-70S

   - useful capacity, kWatts

452

   - plungers, items

3

   - plunger diameter, mm:

 

     a) in delivered set

100

     b) in spare set

120

   - plunger stroke, mm

200

   - gear ratio of power end

4,86

Rotary pump

   - type

CNS 60-200

   - shaft speed, rev/min

1475

   - feed, m3/h

60

   - maximum pressure, MPa (kgf/cm2)

2 (20)

   - transmission

from chassis power takeoff

Measuring tank, m3

4

Manifold

   - internal diameter of pipe line section, mm:

 

      a) suction

100

      b) discharge

50

Control of the unit

From chassis cabin

Auxiliary pipe line length, running meter, not more than:

   - suction, 1 item

4

   - discharge, 7 items

37 (total)

Auxiliary equipment

   - cementing tank volume, m3

0,25

Total dimensions (L x B x H), mm, not more than:

11 000 x 3 910 x 2 780

Weight, kg, not more than:

   a) of equipped unit: chassis, attached implements (including chassis complement , accessories set, etc.), spare wheels*, fuel, lubricant, cooling systems filling)

26 200

   b) of attached implements unit

14 200

   c) of equipped chassis

12 000

Table 2

Unit mode of working (rotation frequency of diesel crankshaft 1800 rev/ min)

Transmission

Total transmission ratio
(gear-box-pump)

Number of double
stroke of pump plunger,
a min.

Plunger d=100 mm

Plunger d=120 mm

Pressure, MPa

Feed, l/s

Pressure, MPa

Feed, l/s

I

22,60

80

70,0*

6,3

51,0*

9,0

II

16,55

109

54,0

8,5

37,5

12,3

III

11,80

153

38,0

12,0

26,6

17,3

IV

9,40

192

30,5

15,0

21,0

22,0

Notes
1 The value of FEED characteristic is calculated.
2 ATTENTION! After the first launching the rig should pass through 60-hours breaking-in. During the breaking-in the value of PRESSURE characteristic should not exceed 75 % of mentioned one. After the termination of the breaking-in you should discharge hot oil from the pump and gear-box, wash the oil reservoir and fill up with fresh oil.
3 * Overload capacity of discharge pressure in appropriate plunger diameter, at which the rig can operate for a short period of time.

The unit on-stream time at any regime is limited by the reheat temperature of oil in pump frame crankcase.

 



> UNB-450x700 pumping unit (cementing unit)

Home | About company | Products | Contacts | Guest book | Order of production | FAQ | Site map
© PCF SPETSTEKHNIKA LLC, phone/fax +7 (3412) 48-38-58, 48-39-27 info@drill-pump.com, http://www.drill-pump.com/